STATION 2
Coupler Cable, Grommet, Subshell and Header assembly
STATION 3.1
Strain Relief and Cable Guide assembly
STATION 3.2
Membrane application and visual check of wires and Membrane positioning
STATION 4.2
Hot riveting and vision check of hot riveting and wire positions
STATION 5
Selective solder process and IPC vision check
STATION 6
Assembly of HMI
STATION 7
Pre-function test
STATION 8
Selective coating and curing
STATION 9
Plasma cleaning and adhesive application
STATION 10
Assembly of ICCPD group
STATION 11
Buffer for the curing of the adhesive
STATION 12
Tightness Test
STATION 13
Application of Top Label
STATION 14
End of Line Test
STATION 15
Application of Bottom Label
STATION 16
Discharging for Burn In or packaging of final product